上下水道インフラ

This program supports efforts to ensure reliable, safe, and sustainable water and wastewater services for communities across Kansas.

資金調達

最大 $2,000 につき
の受益者である。
最大

$650,000

<5,000 Population

$800,000

>人口5,000人以上

マッチ

25%

of the CDBG grant request

申込受付

May 1 – Nov. 14, 2025

応募方法

参加資格

  • done
    受け入れ可能な使用プロジェクトを持つ
  • done
    Benefit low- to moderate-income persons
  • done
    少なくとも25%のマッチング・ファンド

あなたの地域が該当するかどうか確認する

Check qualifications, programs, and more

プログラム概要

目的

について Water and Sewer Infrastructure Grant Program provides vital funding for projects that improve the reliability, safety, and sustainability of water and wastewater systems in Kansas communities. This support helps replace aging infrastructure, expand system capacity, and ensure regulatory compliance through activities such as line replacements, new sewer construction, and treatment facility upgrades that protect public health and promote economic growth.

対象プロジェクト

A total of $1 million has been allocated for the Water and Sewer Infrastructure Grant Program in 2025. This program funds water and sewer infrastructure projects. Eligible expenses include:

  • Construction or renovation of existing water/sewer lines, water towers, water treatment plants, wastewater treatment plants, sewer lagoons, and water meter replacement
  • Engineering costs related to these projects
  • Administration costs for grant funds (up to 12.5% of the grant or $35,000, whichever is less)

CDBG National Objective

All CDBG projects must meet a national objective and involve an eligible activity under the Housing and Community Development Act of 1974. National objectives are 1) benefiting Low- and Moderate-Income persons (LMI), 2) aid in the prevention or elimination of slums and blight, and 3) meet a need having a particular urgency (urgent need).

All activities proposed in applications for the Water and Sewer Infrastructure Grant Program must meet the national objective of benefiting low- and moderate-income persons with a minimum of 51 percent LMI beneficiaries. This can be accomplished either by using HUD census data or by completing an income-based survey. Applicants must receive CDBG approval before starting a survey and follow the approved income-based survey methodology.

選考基準

Grant applications are evaluated for funding based on project need, readiness, impact, sustainability, and matching funds source and availability. Download the 2025 Water and Sewer Program Guidelines for more information on program requirements. Key considerations include:

  • Demonstrating that alternative solutions were examined to address the facility need
  • At or above the current state average for water or sewer rates – 都市: $35.00 | Rural Water: $54.00 | 下水道: $35.00
  • At least 51% of all program participants must meet LMI requirements, which is at or below 80% of the Average Median Income for the county in which the family resigns
  • Communities that have not received a CDBG grant for Community Facilities, Water and Sewer, or Youth Job Training in the past five years will be awarded five bonus points
  • Five bonus points will be awarded if at least 10% of the local match comes from other private sources such as foundations (not bonds or state and federal agencies)

マッチング・ファンド

Local funding is required for all CDBG projects, and no project can be funded entirely by grants. Matching funds can originate from private or public sources, but the application must document that these funds are firmly committed (e.g., a letter of commitment from a bank or other funding source). Examples of matching funds include bank loans, industrial revenue bonds, owners’ equity, contributions from local governments, or grants and loans from economic development entities.

Applicants are allowed to match CDBG funds with other grant funds if that funding is secured in a city/county account by the time the contract is signed. At least 10% of the matching funds must be cash from a local source (i.e., owner funds, city/county cash). Any expenses incurred prior to the grant award are ineligible for reimbursement with CDBG funds. This includes grant writing, engineering, and architecture.

Pre-Application

Applicants must submit a pre-application to confirm eligibility before applying for CDBG funding. This process allows us to provide early feedback and address any eligibility concerns before applicants complete the full application, and ensures projects align with program goals and are prepared for funding. The form requires a brief project description, estimated budget, eligibility status, and readiness to proceed.

Commerce will review submissions within ten days and provide further instructions. Only those with an approved pre-application may submit a full application, but pre-approval does not ensure grant funding. If you are new to the CDBG program, please reach out to us to schedule an initial discussion first. The deadline to submit a pre-application is Oct. 14, 2025.

よくあるご質問

Can a community apply for more than one project?

Communities may apply for multiple CDBG categories but can only be awarded up to two projects total, with no more than one from a major category. Major categories include: Community Facilities: Large/Small, Blueprint to Build, Water and Sewer Infrastructure, and Regional Water Implementation. For example, a city can submit applications for a Housing Rehabilitation and a Community Facilities: Large Grants project. However, a city cannot apply for both a Large and Small Community Facilities project.

What is the public hearing process?

The local government must hold two public hearings to demonstrate that reasonable efforts have been undertaken to ensure involvement of citizens or citizen organizations throughout all stages of the program. A notice about the hearing must be published in a local newspaper with the widest circulation, and it must appear at least 5 full days before the hearing—not counting the day it’s published or the day of the hearing itself. These hearings must be held at a time and location convenient to potential or actual beneficiaries, with accommodations for non-English speaking residents and persons with disabilities. A sample public hearing notice is included in program guidelines.

First Public Hearing: Must be held at least 15 days before the CDBG application is submitted, and no earlier than 120 days. The purpose of the hearing is to inform citizens about the proposed project, including its location, total cost, activities, and beneficiaries. Community members must be given a chance to suggest other project ideas and share their input, and the local governing body should carefully consider this feedback before submitting the application. The total project funding and CDBG amount requested must match what appears in the public hearing notice.

Second Public Hearing: Must be held at the conclusion of the project, prior to close out to inform citizens of the project’s successful or unsuccessful completion, and to obtain input on the grantee’s performance.

Is an environmental review always needed?

Yes, all CDBG-funded projects are federally required to have an environmental review. The Environmental Determination of Level of Review form must be submitted with the application. This will inform Commerce as to what level of environmental review you will undertake for your project if awarded.

Post-award, the city or county must conduct a full environmental review of the project, even for small projects that don’t require construction. This responsibility cannot be delegated and the cost to conduct the review must be paid with local funds. Project activities may not begin until after Commerce issues the environmental release of project funds. Note: Does not apply to Youth Job Training.

すべてのFAQを表示

コミュニティ・ショーケース・マップ

過去に資金援助を受けた他の地域を見る

応募方法

参加資格

LMI ヘルプ 地域開発交付金(CDBG)プログラムでは、CDBGが資金を提供する各活動は、主として低・中所得者層(LMI)に恩恵をもたらすか、スラムや荒廃の防止・除去を支援するか、または特に緊急性の高い地域開発の必要性を満たすものでなければならない。

LMI世帯の所得制限を見る
対象者
家族
LMI世帯所得限度額
1
2
3
4
5
6
7
8

LMI calculations are from the 2020 Census and LMI by household are from 2025 HUD Section 8. Final LMI will be confirmed upon application review.

1

支援を探す

CDBG補助金の経験を持つ専門家の支援は、申請書の合理化と強化に役立ちます。 援助者を雇うための費用の一部または全部は、賞金で賄うことができます。

地域のプロを探す
3

ご質問がおありですか?

Email Ginny Eardley, CDBG Specialist
[email protected]
(785) 230-6319
ja日本語